How it works
The upper row of blocks must be formed from the Cover or Coping Stein. The lower blocks are the so-called Building Stein. Please ensure you select the right blocks for your wall system.
Each block must be connected to the upper and adjacent blocks, using the 3P Connectors, as shown in the diagram. Using a little grease will ease installation of the rubber seals into the blocks.
You must have a connection to the side and to any block above each time. The blocks have markings where they can be drilled (use the optionally supplied circular saw).
The blocks can be filled with filtered water, via a 3P Downpipe Filter. We recommend the Filter Collector which can be connected at 50mm.
The rainwater is taken from the last block in the lowest row.
Using a transparent hose to remove water also allows you to see the level of water in the tank. Standard hose pipe connections can also be used of course.
We also offer a useful hosepipe bracket, so any hose can be tided and stored safely.
|